|
Monaco. The Wally 80 Tango to be at the Monaco Yacht Show |
Warning: imagejpeg() [function.imagejpeg]: Unable to open '/home/bymnews/public_html/new/mambots/content/mosthumb/thumbs/0atango0.jpg' for writing: Permission denied in /home/bymnews/public_html/new/mambots/content/mosthumb/class.img2thumb.inc on line 233
 | | Photo: Wally 80 Tango |
|
|
|
|
|
Thursday, 22 June 2006 |
Megayacht news:
The fourth and fifth units of the Wally 80 design combining the lines of Farr Yacht Design and the interiors of Lazzarini Pickering Architects, are sailing in the South of France and getting ready for the Mediterranean summer cruise.
Shaka is the flush deck, canting keel, three-cabin version of this successful design and features a stunning interior styling specifically developed for this yacht by Lazzarini Pickering Architects.
Tango is the flush deck, fixed keel, three-cabin version and features the wide skylight on the deck house.
Tango made the first public appearance in May at Zegna Trophy 2006, and showed impressive performance by winning the Wally Division. She will be on display at the Monaco Yacht Show in September 20-23, 2006.
The new Wally 80 combines the hull lines of Farr Yacht Design, with the styling and interiors of Wally and Lazzarini Pickering Architects. The concept is to have a performance cruiser with large interior volumes. The yacht comes in several different versions. Given the same hull, the Wally 80 can be personalised in the appendages, deck and interiors, offering up to 16 combinations.
The options of the keel configuration are: fixed, canting, and lifting.
The options of the deck are: Flush Deck, Deckhouse, and Terrace on the sea.
The options of the interiors are related to the deck solution, and are based on the three and four guest cabin layouts, and owner’s foreward and aft layouts. The large volumes of the hull design provide for the three guest cabins with double berths, no bunks. The canting keel does not affect the interior layout because it is stored under the soles.
The Wally 80 is built in advanced composites, pre-preg postcured at 120° C. |
|
Last Updated ( Thursday, 22 June 2006 )
|